Installation Overview At a prominent confectionery site in York, Newsome has installed a high-capacity 400 kW chiller, marking the noteworthy realisation of the project. Designed to reinforce ESG targets, the installation improves cooling reliability while cutting overall power consumption and CO₂ emissions. https://bookmarklayer.com/story20749214/advanced-400-kw-chiller-installation-achieves-50-000-yearly-cost-reduction-on-energy-and-200-tonnes-co%E2%82%82-saving