Penmann successfully delivered a significant HVAC upgrade at Nutricia’s Liverpool facility, implementing a bespoke ventilation and climate control system built to comply with demanding hygiene and production criteria. The contract covered the design, supply, installation and commissioning of high-specification HVAC systems across non-production, Medium Care (MC) and High Care (HC) https://sitesrow.com/story10590371/the-penmann-team-finalises-comprehensive-hvac-refurbishment-for-nutricia-s-production-facility-in-liverpool-supporting-fsi-phase-1-2